Smart terminals · Tablets and phones

Four stages, one SN end to end

SMT, DIP, test and assembly share one site in Heyuan, with many models and mixed batch sizes. Before a unit ships, someone has to answer which reels it consumed, which stations it passed and how it tested.

Data from four process stages lands on one SN, so tracing a finished unit no longer means four systems.

Customer background

Four stages on one site, audits several times a year

Tablets and phones make up most of the mix. SMT, DIP, test and assembly move within one park, handed over by cart and paper. Customers are mostly brand owners who want material and test records per batch before shipment, plus a few audits a year.

Before the rollout each stage kept its own books: batch ledgers in the warehouse, issue slips on the line, results on each tester. Answering a question about one unit meant stitching three records together by hand.

Problems

Three gaps in the way records were kept

The gaps were not about features. They were about who writes what, and where.

  1. 01

    The warehouse counts batches, the line uses reels

    Receiving is logged by batch and issued by quantity, so tracing which boards a reel went into means sweeping a whole batch and comparing issue slips by hand.

  2. 02

    Kitting runs on memory, and so does checking

    A changeover puts dozens of reels at the line side. Wrong picks, missing reels and mixed batches are caught by whoever is watching the line, and at busy hours that is nobody.

  3. 03

    Test records stay on the tester

    Each station keeps results locally. Shipping needs one unit's test data, which means exporting from the machine and piecing it together by SN.

  4. 04

    Carton and SN matched by hand

    Cartons and quantities are written on a paper sheet and re-checked before shipment; short, extra or mixed cartons surface at the customer.

Scope

Four stages, six module groups

Warehouse kitting through packaging, delivered and accepted stage by stage, with warehouse and SMT first.

Process stage

  • SMT
  • DIP
  • Test
  • Assembly

Modules in use

  • Smart warehousing
  • Material traceability
  • Process traceability
  • Test parameter traceability
  • Quality traceability
  • Packaging traceability

View all 15 modules

Approach

Fix the scan at the station

Error-proofing that depends on training does not hold. A step that cannot be passed without a scan does not get skipped.

  1. 01

    One code per location, located on receipt

    A reel is scanned once at receiving; slot and batch are recorded together. Finding material becomes a lookup instead of a walk through the racks.

  2. 02

    Kit lists come from the feeder placement table

    Before a changeover, the work order and placement table name the exact reels, partials and substitutes included. The warehouse kits to the list instead of guessing quantities.

  3. 03

    Scan-verified loading keeps wrong parts off the line

    Part number, batch and slot must agree. A mismatch locks the station and the placement machine cannot start.

  4. 04

    Test data files itself against the SN

    Tester results post back to MES and bind to the SN. Key components in assembly are bound the same way, so a unit and its parts sit in one record.

  5. 05

    DIP key parts and oven profile in one record

    The PCBA is scanned once and key parts bind to it; the wave-solder profile binds to the work order and sits with the station records.

  6. 06

    Cartons weighed, so shipment matches

    Carton IDs generate and bind to SNs; a scale checks upper and lower limits and alarms on short or extra units.

Results

Answerable before shipment and after a complaint

No percentage gains, only the questions the system can answer.

  1. A finished unit traces back to the reel

    By SN you get the reel and its batch; by reel you get the boards it went into.

  2. Shipping documents in one export

    Traceability sheets come out by SN or by batch, instead of being assembled by hand each time.

  3. Wrong parts stopped before placement

    Loading that fails verification blocks the machine, so mixed or wrong material never reaches the test stage.

  4. Packaging no longer checked on paper

    The packing list matches the goods, and a carton traces back to every unit inside.

Similar projects

The multi-stage layout can be copied

If SMT, DIP and assembly sit on one site and records are still on paper, bring the traceability sheet you use today.

Address
Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen

Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.

Used for this conversation only; never shared externally. By submitting you agree to be contacted about this request.

Questions?