Multiple customers on one line, no crossover

The Shenzhen lines switch between customers with the order book, and the same station may run one customer in the morning and another in the afternoon. Material segregation, substitute approval and test records all have to be traceable.

One line runs several customers' models, and neither material nor records may cross over.

Customer background

One set of equipment, several customers

Tablets and notebooks dominate. The customer mix shapes scheduling: many order batches, modest quantities, and the same line switching back and forth. Requirements for material and test records differ from customer to customer.

Before the rollout, segregation relied on floor zoning and a briefing at shift start, substitutes were judged from process documents, and test records lived on testers and in customer-specific spreadsheets. Each audit started with a consolidation exercise.

Problems

Three risks that come with shared lines

The risk in shared production is not capacity. It is whether material and records follow the work order.

  1. 01

    Segregation depends on people

    Different customers' material must not mix, yet separation relies on floor zoning and a shift briefing. A changeover is where the previous order's material follows the next one.

  2. 02

    Substitutes approved verbally, unverifiable later

    Pairings live in process documents and the line decides from experience. When a quality issue appears, nobody can say who approved which substitute or when.

  3. 03

    Customer test requirements differ, records scatter

    Some customers want every parameter retained, others only a verdict. Records are split between testers and each customer's spreadsheet, then reworked before an audit.

  4. 04

    Customer documents and work standards are scattered

    Each customer's SOP sits in its own folder; a changeover means finding the file, confirming the version, and relying on experienced staff.

Scope

Four stages, five module groups

Material locking and loading error-proofing first, then process records and test parameters; packaging keeps the existing barcode rules.

Process stage

  • SMT
  • DIP
  • Test
  • Assembly

Modules in use

  • Smart warehousing
  • Material traceability
  • Process traceability
  • Test parameter traceability
  • Quality traceability

View all 15 modules

Approach

Material and records both follow the work order

Changing customers is not the risk. The risk is a system still carrying the previous customer's ledger.

  1. 01

    Material locked to the work order

    Kitting and loading both bind to the work order; a scan of material from another order is rejected, so zoning is no longer the control.

  2. 02

    Substitutes validated in the system

    Primary and substitute parts are maintained as a group. Loading checks the pairing, and the substitution stays on the work order record.

  3. 03

    Test parameters follow customer templates

    The same station picks a template by model and customer, and results bind to the SN. How much parameter detail is kept is decided by the template.

  4. 04

    Shipping documents in the customer's format

    Traceability sheets and test summaries are generated together. Configure the format once, then export it each time.

  5. 05

    Difference material lights up, only the delta moves

    Previous and next work orders are compared against the placement table; differing material lights up on the rack and same-slot material transfers in one step.

Results

Audits no longer start with a consolidation exercise

No percentage gains, only the questions the system can answer.

  1. Records available during the audit

    By SN or batch you get material, stations and test parameters without a consolidation pass.

  2. Substitutes have a name and a reason

    Who approved a substitute, when, and under which rule is on record.

  3. Changeover handover is no longer verbal

    Clearing and kitting both follow a list, so the previous order's material does not travel into the next.

  4. No wrong document version at a customer change

    SOPs attach to the work order by model and station; unapproved files cannot be issued.

Similar projects

Setting traceability rules for shared lines

If one line runs several customers' models, settle the rules for material segregation and substitute validation first.

Address
Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen

Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.

Used for this conversation only; never shared externally. By submitting you agree to be contacted about this request.

Questions?