SMT electronics manufacturing services · In progress
SMT first, then the stages behind it
The Shanghai plant is mainly SMT work, with many reels and frequent changeovers. The rollout is staged: warehousing and SMT are live, DIP, test and assembly are in implementation.
Control material and wrong-part risk at SMT first, then extend to DIP and assembly.
Customer background
High mix, low volume, fast changeovers
Orders are small-lot and multi-model, with several changeovers a day. SMT has many reels, and finding, checking and replenishing them takes most of the changeover.
Before the rollout, kitting was estimated, loading checked on paper, and solder-paste warm-up and stencil counts kept in a notebook. After a wrong-part event, the only record was the shift's memory.
Problems
Three weak points around a changeover
Material, checking and consumable status, all resting on memory.
-
01
Finding and checking eat the changeover
Dozens of reels are staged at the line at once, and finding, counting and replenishing compete for the same hours.
-
02
Wrong parts checked by people
Loading follows a paper placement table; misses happen at changeover and surface at AOI or test.
-
03
Paste and stencil status on paper
Warm-up time is written on the jar and stencil counts in a notebook; in a busy changeover paste goes on early and a stencil runs past its count.
Scope
Three phases, SMT already live
Warehouse and SMT first, then DIP and test, then assembly and packaging; each phase accepted on its own.
Process stage
Modules in use
Approach
Control material first, data second
At SMT the value is in the changeover: material kitted correctly and loaded correctly, and the records behind it mean something.
-
01
Located on receipt, issued to a list
A reel is scanned once, batch and location recorded; issue follows the kit list from the placement table, FIFO with partials first.
-
02
Four-way loading checks
Old and new reels compared, PDA checks slot, part and feeder, IPQC re-checks, full-slot check at changeover; a mismatch alarms and stops the line.
-
03
Paste and stencils released by status
Paste cannot be issued before warm-up completes; a stencil is scanned at the line to check model, use count and cleaning state, with alarms past the limit.
-
04
Equipment data posts back
Printer, SPI, placement and reflow data are filed against the work order, and the profile binds to it.
-
05
AOI defects return to the station
AOI results post back by board ID, and defect position and code enter the repair record; the board is re-scanned after repair.
Results
Three things already answerable
An in-progress project lists only what can be answered today; the rest is added at each stage acceptance.
-
Loading records generate themselves
No more manual loading sheets; changeover and reel-swap records are queryable.
-
Wrong parts and over-limit items stop at the station
A failed check stops the line; paste or stencil out of status cannot go on.
-
SMT material traces to the reel
By work order or board ID you get the batch and supplier.
-
Later stages reuse the same base records
DIP and assembly go live on the same material and work-order data, with no rebuild.
More cases
Similar projects
Scope varies — match it against the process stages in your own plant.
Similar projects
Stage the rollout, start with the most painful stage
If a whole-plant go-live is too much at once, start with the stage that changes over most often.
- Phone
- 134 1205 3770
- chengzhi780@bczktech.cn
- Address
- Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen
Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.