Smart wearables · Consumer electronics
Small units, many models, missing parts are invisible
Wearables are small and part-dense, with frequent model changes. Assembly relies on visual checks, so a missing or wrong part often surfaces at test or after shipment.
The watch is small; a missing part still cannot pass the station.
Customer background
Small, multi-model, checked by eye
The mix is mostly wearables: many models, modest lots. Key parts in assembly include display, mainboard, battery and mechanics, confirmed by visual check and a self-check sheet.
Before the rollout, part binding was remembered, ageing time and temperature went into a notebook, and packing was counted. When a repaired unit came back, its repair record did not line up with the original production record.
Problems
Three things the eye cannot see
The smaller the product, the more it depends on records.
-
01
Missing parts caught by eye
Display, mainboard and battery are confirmed by visual check and a self-check sheet; with many models, misses happen.
-
02
Ageing time and temperature on paper
Ageing is written in a notebook; when something looks wrong, matching times takes longer than re-testing.
-
03
Packing counted by hand
Cartons are checked by count; short or mixed cartons surface when the customer opens them.
Scope
Warehouse to packaging, six module groups
Assembly and packaging first, then SMT, DIP and test-data collection.
Process stage
Modules in use
Approach
Let the station remember instead of the operator
Small parts cannot be watched; they can be scanned.
-
01
Key parts scanned, missing parts cannot pass
Display, mainboard and battery are scanned one by one; a unit without them cannot enter test.
-
02
Ageing equipment interfaced, time and temperature follow the SN
Results post back by SN, with over-time or temperature excursions flagged.
-
03
Packing weight check with alarm
Upper and lower limits are set and the carton is weighed; the carton ID binds to its SNs, so short or extra units show up at once.
-
04
Repair: receipt, fix and re-test in one record
Cause and replaced parts sit on the original SN; past the repair limit the unit is scrapped.
-
05
Finished-goods movement interfaced with ERP
Documents generate themselves and nothing ships before it is received.
Results
What cannot be seen is on record
No percentage gains, only the questions the system can answer.
-
Missing parts stop at the station
A unit without its key parts stays in assembly.
-
Ageing anomalies trace to the unit
By SN you get ageing time, temperature and result.
-
Weight check catches packing errors
Out-of-range cartons alarm on the spot; carton and SNs are cross-queryable.
-
Repairs trace to the original record
Repair count, replaced parts and production record sit under one SN.
More cases
Similar projects
Scope varies — match it against the process stages in your own plant.
Similar projects
For small-unit assembly, fix the binding list first
If units are small and key parts many, list what must be bound before talking about error-proofing.
- Phone
- 134 1205 3770
- chengzhi780@bczktech.cn
- Address
- Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen
Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.