Automation equipment · Control boards and machines

Every machine on the line, inside the same system

Huaqi Zhengbang builds automation equipment, and its line carries more than one equipment brand. The project is a deep integration: warehousing, four process stages and equipment data act on the same work order, so shortages and wrong parts stop the line at once instead of appearing in a report afterwards.

Equipment data does not arrive as a report; it arrives one protocol at a time.

Client background

Plenty of equipment, no common thread

Printers, SPI, mounters, reflow ovens, AOI and in-line X-ray come from different makers, each with its own software and reports. The data exists; what was missing is the layer that ties it to a work order, a station and an SN.

Before go-live, the equipment record for one work order had to be exported from several machines and stitched together; how much material was left at the line meant walking the stations; and a wrong part was usually found at AOI or test, with a batch already placed.

The problems

Three places people had to fill in

The equipment side has the data; the gap is the layer that matches work order, station and board.

  1. 01

    Each machine keeps its own data

    Printing, placement, reflow and inspection each have separate software, so a work order's full record is copied by hand.

  2. 02

    Shortages found by walking the line

    How much is left on a reel means looking at the station; by the time it is noticed, the line has stopped.

  3. 03

    Wrong parts surface downstream

    A reel loaded at the wrong station is usually found at AOI or test, after a batch has been placed.

Scope

Warehousing, four stages, equipment integration

From kitting to test off-line in one system, equipment integrated by protocol, and data landing on work order, station and board; dashboards split into workstation, overview and alarm views.

Process stage

  • SMT
  • DIP
  • Test
  • Assembly

Modules in use

  • Smart warehousing
  • Loading error-proofing
  • Material traceability
  • Process traceability
  • Test parameter traceability
  • Equipment integration
  • Smart dashboards

View all 15 modules

Approach

Integrate the data first, then control the floor

Integration sits at the protocol layer; control sits in the actions — loading is scanned, shortages stop, wrong parts are blocked.

  1. 01

    Warehouse and line on one ledger

    A reel is scanned once on receipt, location and batch recorded; kits are generated from the feeder table, issued against the work order, first-in-first-out and partial reels first.

  2. 02

    Equipment integrated one by one

    Printers give print speed, squeegee pressure and separation speed; SPI, AOI and in-line X-ray return defect type and location by board; mounters give utilisation, pickup errors and reject rate; reflow ovens give measured zone temperatures; X-ray counters relabel after counting; laser markers take barcode content from the system.

  3. 03

    Station-level loading monitor

    Each station shows part number, loaded quantity, remaining quantity, remaining percentage, reject count and rate, load time and projected run-out; loaded, awaiting refill, shortage and exception read on one line.

  4. 04

    Shortage and wrong part stop the line

    At the threshold or on shortage the system alarms and stops the line; refilling requires scanning both the reel and the station, and the line resumes only on a pass. A failed check names the expected and the scanned station.

  5. 05

    Three levels of dashboard

    The workstation view shows the current work order and machine state; the overview shows production, yield and attainment; the alarm view carries exceptions only.

Results

Records assemble themselves, exceptions stop the line

Questions the system now answers: where a work order's equipment record comes from, when a shortage is known, where a wrong part is caught.

  1. A work order's equipment record assembles itself

    Printing, placement, reflow and inspection parameters hang on the work order and board number; nothing is exported and stitched.

  2. Shortages are seen before the stop

    Projected run-out time against the current takt gives warning early enough to refill before the line stops.

  3. Wrong parts blocked before placement

    A failed check stops the line, so no batch is placed with the wrong part.

  4. Changeovers no longer compared by hand

    Kitting list, feeder table and loading records share one source; a changeover checks differences only.

Equipment integration

Machines still not connected can be reviewed together

Send the equipment list and protocol documents; we can say which connect directly, which need a middle table and which go through files.

Address
Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen

Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.

Used for this conversation only; never shared externally. By submitting you agree to be contacted about this request.

Questions?