Electronics manufacturing · Boards and finished units
Changeover time saved before the changeover
Orders are small and varied, and SMT changes over several times a day. The project did not touch the machine cycle; it took the material and checks around a changeover and moved them: kitting is done in the warehouse, the line only verifies.
High-mix, low-volume: material reaches the line before the changeover.
Client background
Several changeovers a day, half of it spent finding material
Many models, few units per batch, and one mounter runs several products a day. Little of the changeover goes to setting the machine; most goes to finding material, counting and checking station by station.
Before go-live, kitting was estimated from experience and split again at the line; loading compared reels against a paper feeder table station by station, and changeovers were where it slipped; a wrong part surfaced at AOI or test, and a whole batch went to rework.
The problems
The changeover bottleneck is not the mounter
The machine cycle is fixed; what can be compressed is the preparation around a changeover.
-
01
Finding and counting eat the changeover
Dozens of reels wait at the line, and finding, counting and refilling all fall into the same window.
-
02
Wrong parts rely on a second pair of eyes
Loading compares against a paper feeder table station by station; changeovers slip, and a wrong part surfaces at AOI or test.
-
03
Changeover checks leave no record
Whether the check was done, and how many stations were covered, rests on the shift's memory.
Scope
Warehousing, four stages, equipment integration
Warehousing and kitting are the focus; the four stages and equipment data join on the same work order.
Process stage
Modules in use
Approach
Kit earlier, verify later
What can be done ahead moves before the changeover; what must be done on the floor shrinks to one scan.
-
01
Kits generated from the feeder table
Before a changeover the material list is calculated from the work order and feeder table; the warehouse picks by location and delivers a complete set.
-
02
Loading verified by scan
Scan the reel, the station and the feeder, compare with the table; a mismatch alarms and stops the line.
-
03
Changeovers check differences only
For the same product, only changed stations are checked; for a new product, all stations are checked, and the result is kept.
-
04
Equipment data posted back
Printer, SPI, mounter, reflow oven and AOI data are filed by work order; the counter relabels after counting.
-
05
One pass chain across four stages
SMT, DIP, test and assembly share the work order and SN, and later stages inherit earlier data.
Results
A changeover is now checking and setting
Questions the system now answers: which reels this changeover needs, where a wrong part was blocked, how many stations were checked.
-
Kitting has a basis
Kits come from the feeder table instead of an estimated quantity.
-
Wrong parts blocked before placement
A failed check stops the line, without waiting for AOI.
-
Changeover checks leave a record
Which stations, by whom and when — all retrievable.
-
Later stages inherit the data
DIP, test and assembly reuse the earlier work order and material records.
More cases
Similar projects
Scope varies — match it against the process stages in your own plant.
Fast changeover
Many changeovers a day is a reason to change kitting
Starting from the feeder table and the BOM, kits can be generated before each changeover.
- Phone
- 134 1205 3770
- chengzhi780@bczktech.cn
- Address
- Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen
Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.